Tuesday, April 10, 2012

PROJECT PROPOSAL SAMPLE FORMAT‐CUM‐GUIDELINE


SAMPLE FORMAT‐CUM‐GUIDELINE
For writing NGO proposals on RETs/SETs related programmes
for submitting to appropriate Funding Agencies

 


1. Title: - The Title of the project must be attractive and self- explanatory in itself, 
that means, it must mention What is going to be done, for Whom and Where. 
For example, Renewable Energy based Community Oriented Eco-village 
Development Project will be implemented in 20 selected villages in two blocks of 
the Bharatpur district of Rajasthan State. 
2. Executive Summary: - An executive summary of the entire proposal should 
be presented along with the detailed proposal. The summary would give an 
overview of the proposal in brief and is a one page summary. 
3. Project Holder (PH) and Project Implementing Organizations
(PIOS):‐ Give brief information about the main organization acting as the 
project holder or the lead organization and also the various project partners. The 
detail information about the Lead Organization is to be attached as Annexure. 
Also attach Annual Report of past three years, Statement of Income and 
Expenditure for the past three years, list of Governing Board or Executive Body 
or  Management  Committee  Members,  list/  profile  of  the  core  members,  Chief 
Functionary (CF) or Chief Executive Officer (CEO), Project/Programme 
Director/Manager for this particular project, copy of the brochures and other 
supporting documents, List of other project and funding agencies and other 
source s of funding etc. 
4. Existing Infrastructure and staff:- What are the physical infrastructure 
available with the NGO and the professional and field staff with experience as 
well as volunteers and advisors and consultants to implement developmental 
project for poverty reduction and empowerment of marginalized group of people 
incorporating RET activities. 
5. Rationale/Conceptual Framework: -  After the title, would come the 
rationale of the project, stating the purpose of the project, the need for 
beginning the programme. The rationale could be broad based talking about the 
general status to a specific area of the problem OR start with an incident to more 
1 general focus about the issue (could be supplemented with facts and figures). 
Information based on objective research, not subjective impressions, should be 
provided to justify the need or problem. The rationale should be written in a way 
that would lead to objectives. 
6. Objectives: -  Objectives of the project should be minimum of 3 (three) in 
number or a maximum of 5 (five) in number. Preferably, not to separate them 
into long and short term objectives and the objectives must be clear and there 
should be a central focus/ common link in all the objectives. The objectives 
should be such that it would lead to the action/ activities. 
7. Activities:- To clearly state tasks or action the NGO would take to achieve the 
objectives. The activities must be specific, clear and in point form and must flow 
naturally from problems and objectives. 
8. Target Group/ Beneficiaries:-  The project proposal must mention the 
criteria for selecting a particular target group and the number, eligibility of the 
beneficiaries. 
9. Location of the Project:-  Give relevant information  about the precise 
geographical location of the project 
10. RRA, PRA and Baseline Survey the target area: -If the NGOs has 
been working in a number of villages in particular area for a long time and 
wishes to taken RET/SET based comprehensive development activities in a few 
selected villages, as a first step they could use RRA or/and PRA to collect initial 
information from several villages in a short time, to enable them to analyze and 
short list appropriate village to plan and undertake such programme with a long 
term goal of 10 years or so, which could be implemented in phase with 3 years 
project. Because, normally the funding agency only fund a 2-3 year projects, but 
would like to know the long-term goal of the NGO programme, and how to 
realize that goal. Later on, if the proposed project requires, then as the first step 
the NGO will have to do the village level and detail household survey, as a prerequest for planning and formulating practical oriented proposal. For this purpose 
two proforma could be used (a) first for the collection of general and common 
village level data and information and (b) the second for the detailed household 
data (preferably all or at least good number of households) of the families. The 
collection of these data will also enable to understand the present situation as 
well as for situational/problem analysis of the project area and the people and 
identification of target group to be addressed by the propose 
project/programme. For example, for the planning and project formulation for 
taking up long-term programme of RET/SET based community oriented 
integrated village development project.  Later on these base line data could be 
used making second and third project proposal for the same or/and other 
interest funding agencies. NGO will also use this for bench marking and 
comparing the results after a gap of 5 year or so when the second survey would 
2 be done to measure the impact (positive and negative) of the 
project/programme. 
11. Project Duration:-  The proposed project could be a part of the bigger 
programme to achieve the overall goal set. The entire programme could be 
divided in to several phase. For example, phase I, II, III and IV. Phases could be 
divided into preparatory-cum-pilot, followed by two main phases. The last phase 
which will be consolidation and preparation of the target community and handing 
the programme to them, and then withdrawal of NGO from main activities. 
Beyond this period, the NGO taking up role of advisor-cum-mentor and providing 
on[going support and trouble-shooting as well as capacity building and 
facilitation and linkages to governmental programmes to ensure that the project 
reaches the logical end and achieve the overall goal. Each phase could be 
treated as separate project of three years duration. 
12. Organizational Manpower:- Manpower required from within or outside 
the NGO to carry out the project, hierarchy, committee or any either way of 
functioning and qualifications of the personnel. 
13. Implementation Plan/Project Management & Implementation:
- A detailed process, step-by-step or stage wise execution plan to be 
incorporated in the project proposal. 
14. Infrastructure Requirements:- What are the infrastructure needed for the 
project, for example, space, vehicle or equipment. 
15. Monitoring Mechanism:-  Mechanism by which an NGO would check or 
periodically review the project. This portion must contain information as to who 
would monitor– internal or external monitoring, which area would be monitored 
or focus/ thrust area of monitoring. Monitoring of the programme and of financial 
aspect in the project proposal in order to undertake mid-course correction to 
rectify the project at a specific stage and improvise on the same at a given 
moment, so that the desired results are achieved and project goals are realized. 
16. Evaluation:- Mention the objectives of evaluation and how it will be carried 
out. This will help to understand whether data of records is kept or there is 
documentation on the project. Evaluation aids in improvising the future projects 
so that the errors are not repeated  and more precaution and foresight is 
integrated in the project proposal. Evaluation is conducted periodically or 
concurrently as the project is being implemented or at the end of the project. For 
a project of 5-6 years duration it is desirable to have two evaluations, via, (a) 
first one as the mid-term evaluation after 2.5 or 3 years of project 
implementation, and (b) the second evaluation at the end of the project. 
17. Sustainability & Follow‐up/ Direction for the Future:- This aspect 
is very important to ensure the running of the project or to decide viability of the 
3 project in the long run once funding stops. For example, in an income generation 
project for the senior citizens, the latter would take over the project by forming 
an association. 
18. Feasibility and Viability of the Project: Some of the large size 
programmes/ projects (especially an  integrated/ comprehensive development 
project) would require sound feasibility of the project. Either one, some or all of 
the following feasibility (viability) aspects may have to be elaborated in the 
proposal for the consideration of the funding agency(ies) to support the project: 
a) Technical Feasibility:-  Whether the RET/SET oriented project 
(especially from the point of engineering and structural design) is 
technically sound, simplicity but sturdiness, fairly reasonable average 
useful working life under rigorous field conditions etc., have to be 
mentioned (if required with supporting documents attached). If the RET 
has been designed and developed recently, also mention if it has already 
been field tested and field evaluates to ascertain its applicability, 
response of the end users for wider replication and dissemination, also 
attaching any report which could support the claim. 
b) Affordability & Financial Feasibility:-  If the technological 
oriented project, like biogas plants, solar gadgets, SPV system, wind mills 
and Micro hydro etc., then it is important to mention the capital cost and 
how the beneficiaries/end users will  be able to afford to buy the 
gadgets/unit/system. If the initial cost of the system is beyond the means 
of the target groups/communities of the NGO, what financial mechanism 
has been worked out to make SET available to the target groups and how 
they will be able motivated to accept the technology for their benefit. For 
example if the micro-credit/micro-financing has to be used as a means to 
provide the RETs then capabilities of the NGO has to be elaborated in the 
proposal as well as the credit delivery and foolproof loan recovery system 
has to be worked out separately and attached as annexure. 
c) Economic Viability:-  It  is  not  just  enough  to  give  the  cost  of 
buying/installing any RET (especially if the unit is big and the capital cost 
involved is high) but also the operational cost of the unit and pay-back 
period  has  to  be  worked  out.  Any  standard  method  be  used  for  working 
out the economical viability of the unit and attached as Annexure to the 
main project proposal. 
d) Socio‐cultural Feasibility:- If the technological oriented project are 
implemented in a rural areas without proper socio-cultural feasibility, it 
tends to empower only the haves, and further exploits the already 
marginalized have-nots. Therefore, in a bigger project with several 
technological and hardware components, it is important to do the sociocultural feasibility to understand the problems and social dynamics. For 
example, the rural, remote and far-fling areas of India with many cast 
and sub-cast systems prevailing over the centuries as well as the tribal 
belts, it is important to understand and analyze the existing socio-cultural 
4 situation. This will enable the NGO to formulate socio-technical oriented 
proposal which will have human orientation, so that the technology (in 
this case RET) only becomes a means for empowering the target group 
rather than becoming an end in itself, leading to their exploitation and 
further marginalization. The proper socio-cultural feasibility of 
technological oriented project is a must to ensure that the target 
community controls it rather than some one with resources use the 
technology to control them. 
19. Environment Impact of the Project:- If the project is big then it is 
important to work out the intended environment impact of the project, 
to ensure that the project is environmentally sound.
20. Capacity Building:‐ Based on the experience of NGO in promoting 
and implementing technological (including RETs) oriented projects for 
the number of years, it has been realized that most projects are either 
not able to make the desired dent or gets defunct after the withdrawal 
of external implementing and facilitating agencies. There are may 
examples of even simple RETs gadgets, devices and units in India and 
other developing countries; for example implementation of solar 
cooker, improved cook stoves and solar PV lantern etc in 80;s and 90’s 
in India, only backed by subsidies, which could not sustain as the 
programmes were not backed by appropriate capacity building programme. As 
against this, one of the important reasons for the success of the implementation 
of household biogas programme by NGO network (now members of INSED) 
during 80’s and 90’s have been because of systematic capacity building of all the 
key stake-holders (NGOs, rural Artisans and end users etc.). The successful 
implementation of biogas (though at lesser level due to funds constraint) is still 
continuing by NGOs with least failure  rates as compared to many other 
implementing groups in India. In view of this the proposal for large scale 
implementation of any RETs or SET oriented project should incorporate 
appropriate capacity building components as an integrated part of the 
implementation.
21. Budget/Project Cost:-  Budget is a tentative estimate or statement of 
income and expenditure. Thus, it shows where the money is coming from and 
where is it going through. It should relate with aims and objectives as well as the 
activities and expected output proposed to be achieved by the project. 
22.  Share of Project Budget/Project Cost:‐ The budget is the total about 
required to implement the project. However, the funds to implement the project, 
has to come from different sources. Some of them are given below: 
a).  Local Resources:-  It  could be further divided in to four, viz., (i)
beneficiaries/end users own contribution‐ either in kind, labour or
cash, (ii) community contribution,  (iii) NGOs contribution, and 
(iv) Other Local Sources if any. Either individual group contribution or 
total contribution of all the groups can be clubbed and reflected here. 
5 6 
b).  Loan from the Financing Institutions:- If the project proposes 
that the beneficiaries will take loan from the bank then the amount 
should be reflected over here. 
c).  Micro Credit Groups/Micro Finance Groups/Self Help
Groups:-  If the project proposes that  the beneficiaries will take loan 
locally by NGOs under one of these schemes the bank then the amount 
should be reflected over here. 
d).  Grant requested from Funding Agency (ies):- The balance of 
funds of the project has to be  mentioned here to be requested 
from the funding agency as grant. 
23.  Networking, dissemination and Advocacy:- Please describe plans to 
network with other groups for sharing of learning from the project. Also mention 
how the project propose to dissemination the information with other NGOs and 
other agency as well as advocacy with the policy and decision makers for support 
of such project. 
24.  Replicability:-  Write about the possibility of  replication of the project 
elsewhere (in different regions). Also elaborate about the potential for this 
project to be scaled-up or applied on a large scale implementing. 
25.  Innovation:- How is your idea truly innovative or unique? Describe the extent 
to which it uses a novel approach and is different from others in this sector. 
26.  Follow‐up:‐ What are the propose plans for future activities after the project 
is over so that the programme continues to achieve the overall goal of the 
project. 
27. Logical Frame Work Approach (LFA):- There are many ways to design 
a NGO project. Experiences indicate that NGO project proposals often are not 
clear to the donors, in assessing whether the project proposal should be 
supported financially. To achieve a good project, the project idea must be 
prepared thoroughly and adapted to the local condition, together with the 
partners  and  the  target  group.  The  LFA  is  an  useful  tool  to  give  clarity  in 
understanding project goals and objectives etc. LFA is especially useful in bigger 
projects. Refer to Annexure for detail understanding of LFA and how to use it as 
tool for project preparation. 

Friday, March 30, 2012

Foreign Funding Projects, Foreign Funding

we preaper the project reports for foreign funding agencies- 
we provide sample projects- 
we preaper the Detailed Project Reports (DPR) For FFAgencies- 
WE PREAPER THE CONCEPT NOTES - 
MORE DETAILS- 
Mail-
foreignfundingprojects@gmail.com 
www.ngosamachar.org.in 
www.centralgovernmentschemes.blogspot.com 
COMPLETE FOREIGN FUNDING INFORMAION- 
VISIT- 
http://www07.grants.gov/search/category.do 
www.fundsforngos.org

Friday, March 16, 2012

Member Ship

NGO Samachar and Associate


To
Dear Sir/Madam,
Subject : Profile NGO Samachar and Associate Programme.

INTODUCTION
Ngosamachar Started 7 years Back Association With CWSPL To Provide Consultancy Services to Indian Ngo Sector-
We are involved in sharing important information and current policy initiatives in the development sector for strengthening the efforts of all such organizations and NGO's who are involved in development activities.
Ngosamachar works under name of a registered society “Society for Services" located at New Delhi And
Over All Management is Under CWSPL
We provides different sort of services to N.G.O.'s to help them in their day-2-day activities like: Project Reports, Consultancy Services, Liasioning Services, Registration Services, Database Services, Website Designing Services, etc.
We provide the following services to NGO’S:
1.       Project reports – We prepare the project reports for central govt. schemes, foreign funding agencies & industries. Educational Institutes, Medicinal Plants Sector Etc
Visit Below link For project Cost Structure-
http://www.ngosamachar.org.in/project-cost-structure.shtml

2.       Consultancy Services - We provide consultancy services to N.G.O.’s and industries as per your requirements.

3.       Database - We provide entire data regarding N.G.O.’s schemes in central govt. schemes in central govt. ministries &central govt. departments. Etc.
Check The Link For Databases-
http://www.ngosamachar.org.in/A2Z_PROJECTS-_DIRECTORIES_-SOFTWARES_IN_INDIA-[1].pdf

4.       Liasioning – We provide liasioning services to N.G.O.'s and industries as per your requirements.

5.       Registration- We deal all registrations like society, Trust, 80 g , F.C.R.A. ,35 ac, 35 ac 1&2,501 c(3) etc.

6.       Service charges- We provide total service to N.G.O.’s like information providing, projects follow up, project reports preparing etc.

7.       Website Designing- We provide website designing and development, domain name registration services & web hosting services to NGOs and others at affordable rates.
We provide website designing and development for NGO’s Only in INR3000
Domain name registration, web hosting services to NGOs at affordable rates.
Features of Package:-

a)      Domain.org or .org.in
b)      1 GB Web Hosting
c)       5 E-Mail ID
d)      10 Static Pages OR Two Dynamic Pages
e)      JUST - INR 3000 ONLY
Note-Special offer for Ngo's-
BOOK DOMAIN GET FREE HOSTING OR BOOK HOSTING GET FREE DOMAIN-
8.      MEMBER SHIP
Member Ship Benefits-
a)      Weekly News Letter with Latest Schemes (Central, State and Foreign Funding) By E-Mail
b)      Daily up Dates of Latest Schemes (Central, State and Foreign Funding) By SMS
c)       Free Entry for Training Programs Conducted By Ngosamachar
d)      10% Deduction on Project Reports Cost Structure
e)      Sub Domain Web Site 5 Pages with 1 E-Mail ID
f)       Member Ship Valid For 1 Year
g)      Member Ship Fee INR 3000 Only
Note:
We don't interfere in any money matters, we provide service and we take only service charges.
NGO Samachar is a service provider not a funding agency
9.       ELIGIBILITY CRITERIA OF ASSOCIATES-STATE ASSOCIATES:-
a)      Required Office Space-300 SFT OFFICE SPACE WITH FURNISHED-
b)      THREE COMPUTERS  P4
c)       4 TECHENICAL STAFF WITH MINIMUNM QUALIFICATION (DEGREE OF SOCIAL WORK)
d)      LAND LINE PHONE, FAX AND INTERNET IS MUST-
e)      Security  Deposit  INR 1 Lac Only
f)       INR 50,000 Only is refundable
g)      VALIDITY 1 YEAR
Benefits :-State website
50 Sample Projects
SMS Campaign in concern state
E-mail campaign in concern state
20% OF Total Services Charges (FEES) COLLECTED BY Ngosamachar from Different Services Like:
a)      Member Ship
b)      Ngo Web Sites
c)       Project Reports
d)      Sample Projects,
e)      Registrations
f)       Project Follow Up
g)      Liasioning
h)      Work Shops, Seminars
i)        Databases Etc.
DISTRICT ASSOCIATES:-
a)      Required Office Space-200 SFT OFFICE SPACE WITH FURNISHED-
b)      THREE COMPUTERS  P4
c)       TECHENICAL STAFF WITH MINIMUNM QUALIFICATION (DEGREE OF SOCIAL WORK)
d)      LAND LINE PHONE, FAX AND INTERNET IS MUST
e)      Security  Deposit INR 50,000 Only
f)       INR 25,000 Only is refundable
g)      VALIDITY 1 YEAR
Benefits of District Associates:-
District website
20 Sample Projects
SMS Campaign in concern District Level
E-mail campaign in concern District Level
 10% OF Total Services Charges (FEES) COLLECTED BY Ngosamachar from Different Services Like
a)      Member Ship,
b)      Ngo Web Sites,
c)       Project Reports,
d)      Sample Projects,
e)      Registrations,
f)       Project Follow Up,
g)      Liasioning,
h)      Work Shops, Seminars,
i)        Databases Etc
RESPONBUILTIES OF ASSOCIATES-
COLLECT THE REQUIRED INFORMATION FROM Ngos-
District Level Associates Forward to All information and Documents to State Associates-
State Level Associates Forward to All information and Documents To Ngosamachar Office
Time Period- Minimum 5 Working Days After Provide the Information-
Kindly feel free to contact for any further query, if any.

Thanks with regards

For NGO SAMACHAR

U M NAIDU
M. No. +91 9654613221
e-mail : 
ngosamachar@gmail.com
visit us @ 
www.ngosamachar.org.in

Saturday, March 10, 2012

Community Radio Stations


Ministry of Information and Broadcasting
[Community Radio Stations ]
S.No
Title
1.
Community Radio stations Guidelines
iPolicy Guidelines for setting up Community Radio Stations in India (updated  dated 04/12/2006)
iiEmpanelment of Operational Community Radio Stations
iiiCompendium 2011 Community Radio Stations in India
2.
Application Forms
iApplication Form for the Grant of Permission for setting up CRS
iiApplication form for Migration from old Guidelines to new Guidelines 2006 for operating Community Radio Station
iiiForm for renewal of grant of permission for setting up community radio station.  
ivCRS GOPA
vCRS Migration GOPA
viBank Guarantee Proforma for Community Radio Station ( PDF)
viiSubmission of Base Line Survey Report for setting up a Community Radio Station-for information to all applicants
viiiSurvey Questionnaire
3.
Facts & Figures
iCRS Status at a Glance
iiList of Operational CR Stations
iiiList of CRS who have signed GOPA
ivList of LOI Holders
vList of Rejected Applications for Grant of permission for setting up Community Radio Station
viList of Applications under consideration in the Ministry for permission to setup Community Radio Station.
4.Press Release permitting the existing Community Radio Station/operators for Broadcasting Advertisements as per the New Guidelines issued in december 2006
5.DAVP rates for Advertisement on Community Radio Stations
6.State Level Consultation for Community Radio Awareness During 2009-10
7.Frequently Asked Questions
Notices
1Notice to all Community Radio Stations which have signed GOPA
2Notice to all letter of Indent holders for setting up of Community Radio Station
3.No Need for Project Report for CRS permission- Notice regarding
4.Workshop with letter of Indent Holders for Community Radio
5.National Community Radio Awards

Note-

WE PREAPER THE PROJECT REPORTS FOR CRS AND PROVIDE SAMPLE PROJECTS ALSO-

Dear Sir
Please Send a Mail For Future Correspondence-

Cost Structure-
http://ngosamachar.org.in/project-cost-structure.shtml
How To Pay-
http://www.ngosamachar.org.in/how-to-pay.shtml
Contact Us-
http://www.ngosamachar.org.in/contact-us.shtml

U.M.Naidu
www.ngosamachar.org.in
http://groups.google.com/group/ngo-projects




Monday, March 5, 2012

Registrations


NGO SERVICES

REGISTRATION OFPROJECT & FEASIBILITY REPORTOTHER SERVICES AND GUIDANCE
NGO Registration
Society Registration
Trust Registration
Co-Operative Society Registration
Non Profit Company
Non Profit Organization
Non Government Organization
NPO
ISO for NGO
CERTIFICATES 
12A Registration.
80 G Registration
ISO Registration
35AC Registration
35 (1&2)
FOREIGN CONTRIBUTION REGULATION ACT
FCRA Registration
Permanent FCRA
Prior Permission
Amendments
Project Report Development
Project Report Preparation
Project Proposal Preparation
Utilization Certificate
Event / Visit Report
Presentation
NGO Profile
Evaluation Report
Survey
Research Report
Planning
Policy Document
Concept Note
Feasibility Report Development
Deeds
Rules & Regulation
Leaflet
Booklet
Format Development
Legal Advice
NGO Grants
NGO Funds
NGO Donations
Governmnet Schemes
Private Sector Schemes
Corporate Sector Scheme
International Schemes
Government Policies
Office Stationary
Logo
Letter Head
Visiting Card
Envelop
File & Folders
Browser
Website Solutions For NGOs
Website Development
Website Designing
Static Website
Dynamic Website
Flash Website
EDUCATIONAL PROJECT REPORT
Dental College
Medical college
Research centre
Ayurvedic College
Homeopathic and Biochemistry college
Polytechnic Colleges
Engineering Colleges
Physical Education Colleges
College Of Social science
Institute Of Mass Communication
Science College
Arts and Commerce College
Hotel Management and Catering Technology College
Social Work College
Mass Communication College
Bachelor of Education (B.Ed.) College
D.Ed. COLLEGE
AVIATION / FASHION / Interior Desinging College

-- 
Dear Sir/Madam

We provide the following services to NGO’S:

1) Project reports – We prepare the project reports for central govt. schemes, foreign funding agencies & industries.
 
2) Consultancy Services - We provide consultancy services to N.G.O.’s and industries as per your requirements.
 
3) Database - We provide entire data regarding N.G.O.’s schemes in central govt. schemes in central govt. ministries &central govt. departments.

4) Liasioning – We provide liasioning services to N.G.O.'s and industries as per your requirements.

5) Registration- We deal all registrations like society, Trust, 80 g , F.C.R.A. ,35 ac, 35 ac 1&2 ,501 C(3) etc.

6) service charges- We provide total service to N.G.O.’s like information providing, projects follow up, project reports preparing etc. 

7) Website Designing- We provide website designing and development, domain name registration services & web hosting services to NGOs and others at affordable rates. 
Note: We don't interfere in any money matters, we provide service, we take only service charges.
NGO Samachar is a service provider not a funding agency.


Dear Sir
Please Send a Mail For Future Correspondence-
Feed Back-
http://www.ngosamachar.org.in/feedback.shtml
Cost Structure-
http://ngosamachar.org.in/project-cost-structure.shtml
How To Pay-
http://www.ngosamachar.org.in/how-to-pay.shtml
Contact Us-
http://www.ngosamachar.org.in/contact-us.shtml


Visit The Blogs For Central & Foreign Funding Projects-

http://www.foreignfundingprojects.blogspot.com/

http://centralgovernmentschemes.blogspot.com/

U.M.Naidu

www.ngosamachar.org.in

http://groups.google.com/group/ngo-projects

Note-

Telephonic Support Is Provided Only Members-

If You Want Any Services-Please Mentioned  Clearly What You Want-

VISITING CHARGES LOCAL DELHI (NCR) 3,000/ PER VISIT-

OUT STATION CHARGES 10,000/PER VISIT


SMS TO-09654613221